Titan Electrical Solutions
c.1945–1965 · Post-War Semi

EICR — Electrical Safety Checks for Post-War Semi properties in Cardiff

cavity brick with plasterboard finishes, concrete lintels. Good loft access, generous under-floor voids and a straightforward driveway make the physical work easy; the variable is always the CU generation.

EICR — Electrical Safety Checks on a post-war semi in Cardiff is a physical problem before it is an electrical one. The stock is c.1945–1965, walls are cavity brick with plasterboard finishes, concrete lintels, and the practical constraint is that good loft access, generous under-floor voids and a straightforward driveway make the physical work easy; the variable is always the cu generation.

That shapes every line on the quote. We survey the hallway or garage, the cable route and the consumer unit location before pricing — because on this property type the standard scope is only standard once you know what you're working around.

What to expect

  1. 01

    Photo or on-site survey

    Focus on the hallway or garage, the consumer unit location, and the intended cable route. Usually 15–30 minutes on-site or a short photo set.

  2. 02

    Written fixed quote

    Priced against your post-war semi's specific construction, not a template. Route sketched, materials listed, no line-item surprises.

  3. 03

    Booked around access

    Diary planned for the access constraint that matters on this stock — good loft access, generous under-floor voids and a straightforward driveway make the physical work easy; the variable is always the cu generation.

  4. 04

    Certificate + evidence pack

    NICEIC certificate, photo evidence of hidden work, Part P where applicable — all emailed the evening the job signs off.

What we build into every quote

  • Access constraints priced into the diary — a post-war semi in Cardiff isn't the same working day as a new-build with an empty garage.
  • Wiring generation on record (rewired 1990s–2010s) so the quote reflects what's actually in the house, not what the brochure assumes.
  • Fixed price at quote stage, calibrated to c.1945–1965 construction — not a generic South Wales rate.
  • Certificate at the end, delivered the same evening, in the format your next EICR or agent will expect.

Construction & access

Good loft access, generous under-floor voids and a straightforward driveway make the physical work easy; the variable is always the CU generation.

Wiring generation & likely findings

Wiring generation on this stock is typically rewired 1990s–2010s; kitchen and bathroom often updated separately with mixed board vintages. On a post-war semi you should expect us to flag: kitchen refit added post-rewire, socket circuit no longer matches the original ring layout; bathroom shower feed on a 6mm radial with an isolator hidden above the ceiling; outside tap or outside socket added on a spur without RCD protection.

Materials we spec

Materials and methods we spec on post-war semi work: metal-clad 18th Edition CU with RCBO per circuit; SPD retrofit; shower feed uprated to 10mm where the run length demands it. Everything is priced on the quote — nothing added on invoice.

Cardiff context

Across CF10–CF24 the post-war semi stock we've worked on shares consistent patterns: kitchen refit added post-rewire, socket circuit no longer matches the original ring layout. That local pattern is baked into the quote, not discovered on the day.

FAQs — post-war semi in Cardiff

Do you need to see the property before quoting?+

For a post-war semi usually yes — a 15-minute survey or a set of photos of the hallway or garage and the consumer unit is enough to write a fixed price.

What materials do you spec on this property type?+

metal-clad 18th Edition CU with RCBO per circuit; SPD retrofit; shower feed uprated to 10mm where the run length demands it. All on the written quote.

What's specific about eicr — electrical safety checks on a post-war semi?+

Two things: kitchen refit added post-rewire, socket circuit no longer matches the original ring layout, and the wiring generation — rewired 1990s–2010s. Both go on the quote, not the invoice.

Will the work affect any original features?+

Not unless the quote says so. On period stock in particular we route through floors, lofts and non-original plaster; cornices, dado rails and original panelling stay intact.

Nearby coverage

Owners of post-war semi properties in Cardiff, Penarth and the wider area get one point of contact for the lot — quote, work, certificate, after-care.

Local proof

"Quick, easy and clear with the process! Would definitely call out again for future work." Lauren Filby, Sockets & Lights — Two Rooms

Summary

Short version: eicr — electrical safety checks on a post-war semi in Cardiff works best when the survey accounts for cavity brick with plasterboard finishes, the quote is fixed, and the materials (metal-clad 18th Edition CU with RCBO per circuit) are matched to the stock — not lifted from a new-build spec.

EICR — Electrical Safety Checks on post-war semi stock — Cardiff

Cardiff eicr — electrical safety checks: modern fuse board installed in a domestic hallway, photographed on-site in CF10–CF24 (Splott, Leckwith and Cardiff Bay business parks)EICR testing in progress with a multi-function tester on a live circuit — eicr — electrical safety checks by Titan Electrical Solutions at a modern estates in Pontprennau post-war semi property in Cardiff (CF10–CF24)EICR — Electrical Safety Checks project in Cardiff: electrical safety report being filled in on-site, delivered on a 1930s bay-fronted semis around Whitchurch and Llanishen address Cardiff

Get a fixed price for eicr — electrical safety checks on your Cardiff post-war semi

Post-War Semi owners in Cardiff usually want to know two things: will you know what you're looking at, and will the price be fixed. Yes to both — we work on this stock every week and price everything on paper.

EICR — Electrical Safety Checks on post-war semis in nearby towns