Titan Electrical Solutions
c.1945–1965 · Post-War Semi

Specialist consumer unit upgrades on post-war semi stock in Cardiff

cavity brick with plasterboard finishes, concrete lintels. Good loft access, generous under-floor voids and a straightforward driveway make the physical work easy; the variable is always the CU generation.

If you own a post-war semi in Cardiff and need consumer unit upgrades, the right spec is usually not the most expensive one. On this stock the sensible answer is metal-clad 18th Edition CU with RCBO per circuit — matched to the wiring generation, not a lift-and-shift from a new-build brochure.

That is the standard we quote to. Fixed price, honest survey, SPD retrofit, and paperwork the next EICR won't question.

What to expect

  1. 01

    Photo or on-site survey

    Focus on the hallway or garage, the consumer unit location, and the intended cable route. Usually 15–30 minutes on-site or a short photo set.

  2. 02

    Written fixed quote

    Priced against your post-war semi's specific construction, not a template. Route sketched, materials listed, no line-item surprises.

  3. 03

    Booked around access

    Diary planned for the access constraint that matters on this stock — good loft access, generous under-floor voids and a straightforward driveway make the physical work easy; the variable is always the cu generation.

  4. 04

    Certificate + evidence pack

    NICEIC certificate, photo evidence of hidden work, Part P where applicable — all emailed the evening the job signs off.

Cardiff context

Across CF10–CF24 the post-war semi stock we've worked on shares consistent patterns: kitchen refit added post-rewire, socket circuit no longer matches the original ring layout. That local pattern is baked into the quote, not discovered on the day.

What we build into every quote

  • Cable routing planned around cavity brick with plasterboard finishes, concrete lintels — no chasing walls that don't take a chase, no mid-job "we couldn't get through".
  • Common post-war semi findings we flag before quoting: kitchen refit added post-rewire, socket circuit no longer matches the original ring layout.
  • Access constraints priced into the diary — a post-war semi in Cardiff isn't the same working day as a new-build with an empty garage.
  • Wiring generation on record (rewired 1990s–2010s) so the quote reflects what's actually in the house, not what the brochure assumes.

Construction & access

Good loft access, generous under-floor voids and a straightforward driveway make the physical work easy; the variable is always the CU generation.

Wiring generation & likely findings

Wiring generation on this stock is typically rewired 1990s–2010s; kitchen and bathroom often updated separately with mixed board vintages. On a post-war semi you should expect us to flag: kitchen refit added post-rewire, socket circuit no longer matches the original ring layout; bathroom shower feed on a 6mm radial with an isolator hidden above the ceiling; outside tap or outside socket added on a spur without RCD protection.

Materials we spec

Materials and methods we spec on post-war semi work: metal-clad 18th Edition CU with RCBO per circuit; SPD retrofit; shower feed uprated to 10mm where the run length demands it. Everything is priced on the quote — nothing added on invoice.

Nearby coverage

Owners of post-war semi properties in Cardiff, Penarth and the wider area get one point of contact for the lot — quote, work, certificate, after-care.

FAQs — post-war semi in Cardiff

How do you handle cable routing on a post-war semi?+

Good loft access, generous under-floor voids and a straightforward driveway make the physical work easy; the variable is always the CU generation. We mark the route at survey and price against it.

Is a CU swap enough for a post-war semi, or do I need a rewire?+

A CU swap is usually enough. We test every circuit at survey and only recommend rewiring where the readings genuinely justify it.

Is there a call-out or survey fee?+

No — surveys for Cardiff post-war semi enquiries are free. You only pay once the fixed-price scope is agreed.

Do you need to see the property before quoting?+

For a post-war semi usually yes — a 15-minute survey or a set of photos of the hallway or garage and the consumer unit is enough to write a fixed price.

What materials do you spec on this property type?+

metal-clad 18th Edition CU with RCBO per circuit; SPD retrofit; shower feed uprated to 10mm where the run length demands it. All on the written quote.

Local proof

"Quick, easy and clear with the process! Would definitely call out again for future work." Lauren Filby, Sockets & Lights — Two Rooms

Summary

Bottom line: post-war semi owners in Cardiff deserve a quote calibrated to c.1945–1965 construction, not a template. That's what we do, on every job.

Consumer Unit Upgrades on post-war semi stock — Cardiff

Titan Electrical Solutions — consumer unit upgrades in Cardiff. consumer unit swap with clean cable dressing on a modern estates in Pontprennau home near M4 J32–J33Cardiff consumer unit upgrades: modern fuse board installed in a domestic hallway, photographed on-site in CF10–CF24 (near M4 J32–J33)EICR testing in progress with a multi-function tester on a live circuit — consumer unit upgrades by Titan Electrical Solutions at a Victorian and Edwardian terraces across Cathays and Roath post-war semi property in Splott, Leckwith and Cardiff Bay business parks (CF10–CF24)

Talk to an electrician who works on post-war semi stock every week

Send the address, a photo of the hallway or garage and the consumer unit, and the modernise without a full rewire you're working towards. Written fixed quote back inside 24 hours, priced to the actual construction of your post-war semi.

Consumer Unit Upgrades on post-war semis in nearby towns