Titan Electrical Solutions
For Landlords

Full Property Rewires for Landlords in Swansea

Meeting the Welsh Government 5-yearly EICR rules and keeping tenancies compliant without spending needless money on remedials.

Landlords in Swansea usually only book full property rewires once a real trigger has landed — tenancy renewal, agent audit, licensing deadline or a chase from the local authority. That is the honest starting point for this page, because the brief you have in front of you now is very different from the one a homeowner would hand us.

We work across SA1–SA7 weekly and quote full property rewires on a fixed-price basis after a short survey. What you get back is an EICR PDF the letting agent will accept, invoice in the landlord name, and Part P notification numbers where any work triggered them.

What we build into every quote

  • Fixed price at quote stage: everything is on the written quote, so landlord approvals happen once, not twice.
  • Invoice routes to the landlord as standard. Split billing across multiple rentals or landlords is normal.
  • Paperwork is delivered in the format your agent, solicitor or insurer actually accepts — no "we'll email a copy later" gaps.
  • Deadline-aware scheduling is default, not a premium — we build the diary around your renew the tenancy, not ours.

Why landlords book full property rewires first

Rewiring between tenancies is usually the cheapest window — we sequence the work to your changeover date, not ours.

What to expect

  1. 01

    Photo or on-site survey

    Photos of the CU and meter, or a 15-minute visit — enough to write a fixed quote.

  2. 02

    Written fixed quote

    Priced to your tenancy renewal, invoice routed to the landlord, no line-item surprises.

  3. 03

    Booked to your deadline

    Same-week for standard scope, planned longer where the shutdown window or rental logistics demand it.

  4. 04

    Certificate + paperwork pack

    NICEIC certificate, photo evidence, and any Part P or licensing paperwork emailed the evening the job signs off.

Why Swansea specifically

Routing in from M4 J42–J47 keeps our lead time on Swansea landlord jobs tight — we combine landlord bookings with the wider Swansea diary rather than pricing a premium for the postcode.

FAQs — landlords in Swansea

Who does the invoice go to?+

The landlord, as standard. We handle split billing for landlords managing multiple rentals across Swansea.

How do you handle a rewire between tenants?+

We book to the void window, front-load first-fix, and coordinate the plasterer and decorator so the property is re-let ready on your target date.

What paperwork do we get at the end?+

An EICR PDF the letting agent will accept, invoice in the landlord name, and Part P notification numbers where any work triggered them. All emailed the same evening the job signs off.

Do you cover Neath and Llanelli as well?+

Yes — Neath, Llanelli, Port Talbot run on the same diary and same fixed-price model as Swansea itself.

Is there a call-out or survey fee for a Swansea quote?+

No — quotes and photo/site surveys for landlord enquiries in Swansea are free. You only pay once the fixed-price scope is agreed.

Proof and paperwork

Rent Smart Wales-compliant paperwork on every rental job, EICRs in the exact NICEIC format the Welsh Government process references, delivered inside the 28-day window.

Nearby coverage

Landlords with rentals across Swansea and the wider Neath / Llanelli area get one point of contact for the lot — quote, work, certificate, after-care.

Summary

If you take one thing from this page: the trigger you called about (tenancy renewal) is what the quote should be built around. Everything else — brand of gear, exact scope, upgrade suggestions — is downstream of that.

Full Property Rewires work — Landlords in Swansea

bathroom electrical remodel with zone-compliant lighting — full property rewires by Titan Electrical Solutions at a older miners' housing in Morriston and Landore property in off the A483 and Fabian Way (SA1–SA7)Full Property Rewires project in Swansea: pendant lighting installed above a dining table, delivered on a coastal terraces and detached homes in Mumbles and Sketty address off the A483 and Fabian Waycluster pendant lighting fitted in a renovated kitchen completed during a full property rewires job in SA1–SA7 — Swansea (SA1–SA7)

Swansea full property rewires for landlords — quoted inside 24 hours

Calling is faster than a form for deadline-driven landlord briefs. Two-minute triage, honest read on lead time, booked into the diary the same call.

Full Property Rewires for landlords in nearby towns