Titan Electrical Solutions
For Landlords

Consumer Unit Upgrades for Landlords in Pontypridd

Meeting the Welsh Government 5-yearly EICR rules and keeping tenancies compliant without spending needless money on remedials.

Landlords in Pontypridd usually only book consumer unit upgrades once a real trigger has landed — tenancy renewal, agent audit, licensing deadline or a chase from the local authority. That is the honest starting point for this page, because the brief you have in front of you now is very different from the one a homeowner would hand us.

We work across CF37–CF38 weekly and quote consumer unit upgrades on a fixed-price basis after a short survey. What you get back is an EICR PDF the letting agent will accept, invoice in the landlord name, and Part P notification numbers where any work triggered them.

What to expect

  1. 01

    Photo or on-site survey

    Photos of the CU and meter, or a 15-minute visit — enough to write a fixed quote.

  2. 02

    Written fixed quote

    Priced to your tenancy renewal, invoice routed to the landlord, no line-item surprises.

  3. 03

    Booked to your deadline

    Same-week for standard scope, planned longer where the shutdown window or rental logistics demand it.

  4. 04

    Certificate + paperwork pack

    NICEIC certificate, photo evidence, and any Part P or licensing paperwork emailed the evening the job signs off.

Why Pontypridd specifically

About 12 miles from Cardiff, Pontypridd sits inside our standard patch — we're regularly in Cardiff and Aberdare on the same fixed-price model.

What we build into every quote

  • Part P notification and building-regs certificate handled at no extra charge.
  • We quote against the trigger you told us about at booking (tenancy renewal, agent audit, licensing deadline or a chase from the local authority), not a generic checklist.
  • Local supply conditions in CF37–CF38 vary street to street — we check the earthing arrangement (TT / TN-S / TN-C-S) before quoting the consumer unit upgrades scope.
  • Fixed price at quote stage: everything is on the written quote, so landlord approvals happen once, not twice.

Why landlords book consumer unit upgrades first

A CU upgrade at a rental usually gets triggered by a C2 on the EICR — we quote the swap on the same visit so you don't pay a second callout.

Nearby coverage

Portfolio landlords often manage rentals in Pontypridd, Cardiff and Aberdare — we consolidate the schedule so it lands as one visit day, not three.

FAQs — landlords in Pontypridd

What if the scope changes mid-job?+

Any change is priced and agreed in writing before we do it. The number on the original quote is the number on the invoice unless you signed off an extra.

Can you invoice the landlord, not the tenant?+

Yes — split-billing is normal. Invoice goes to the named landlord, tenant copied on the certificate.

How fast can you attend a landlord consumer unit upgrades enquiry in Pontypridd?+

Standard turnaround for a Pontypridd landlord enquiry is a written fixed quote inside 24 hours and a booked visit inside the week. Deadline-driven briefs (tenancy renewal) get prioritised.

Who does the invoice go to?+

The landlord, as standard. We handle split billing for landlords managing multiple rentals across Pontypridd.

What paperwork do we get at the end?+

An EICR PDF the letting agent will accept, invoice in the landlord name, and Part P notification numbers where any work triggered them. All emailed the same evening the job signs off.

Proof and paperwork

Portfolio landlords in Pontypridd get one point of contact for every rental — one WhatsApp thread, one invoicing convention, one certificate format.

"I can't thank Gareth enough for the rapid response. He completed the job and I'm very pleased. Would definitely contact if I need anything else." Mrs P, Boiler Electrical Problem

Summary

If you take one thing from this page: the trigger you called about (tenancy renewal) is what the quote should be built around. Everything else — brand of gear, exact scope, upgrade suggestions — is downstream of that.

Consumer Unit Upgrades work — Landlords in Pontypridd

EICR testing in progress with a multi-function tester on a live circuit — consumer unit upgrades by Titan Electrical Solutions at a tightly-packed Taff valley terraces in Treforest and Cilfynydd property in Treforest student belt (CF37–CF38)Consumer Unit Upgrades project in Pontypridd: outdoor socket and cable routing on a rear elevation, delivered on a small industrial and retail units on Treforest Estate address Treforest student beltconsumer unit swap with clean cable dressing completed during a consumer unit upgrades job in Pontypridd — Pontypridd (CF37–CF38)

Pontypridd consumer unit upgrades for landlords — quoted inside 24 hours

Calling is faster than a form for deadline-driven landlord briefs. Two-minute triage, honest read on lead time, booked into the diary the same call.

Consumer Unit Upgrades for landlords in nearby towns