Everything above comes down to one thing: get fixing an unsatisfactory eicr measured before you buy it. Bridgend County Borough Council area coverage, Bridgend included.

  1. 1. Review the existing report and separate mandatory codes from recommendations
  2. 2. Carry out the work, retest the affected circuits and certify
  3. 3. In our experience locally, reissue or supplement the report confirming the installation is satisfactory
  4. 4. Price the remedials line by line so you can see what each code costs to clear

The starting question with fixing an unsatisfactory eicr is always the same: what does the existing installation test at?

C2 means potentially dangerous and requires urgent remedial work. Properties around Bridgend that have changed use — a room converted, an extension added — usually need a wider look than the original request implies. That is the honest version, rather than the version that sells more work.

Timescales are given honestly. If a part has to come, we say when rather than leaving it open. It is the difference between a fixed price and an estimate.

We do not upsell a full replacement where a component is at fault, and we do not patch something that has reached the end of its life. Nothing about it is unusual for property of that age.

A fair amount of this work is preparation: confirming reissue or supplement the report confirming the installation is, planning the route, agreeing what happens if something unexpected appears behind the plaster. On a Bridgend job that usually shows up as reissue or supplement the report.

Questions asked during the visit get answered during the visit; there is no benefit to either of us in keeping it mysterious. That is the difference between a guess and a measurement.

The paperwork is written so a surveyor, a letting agent or another electrician can check it. Questions before booking are free, and often end the conversation there.

Remedials from a previous cycle never completed and now — the version of this we meet most often on post-war semis in Brackla and Wildmill around Bridgend.

A report returned unsatisfactory by another contractor, which is why the whole circuit gets tested and not just the visible part.

An agent or tenant chasing remedials before a tenancy. That is the finding, not the diagnosis.

Homeowners describe this as a fault; technically it is a purchase held up by an adverse electrical report.

Around CF31–CF35 we schedule reissue or supplement the report confirming the installation is to avoid a second journey.

Review the existing report and separate mandatory codes. That covers the part most people are unsure about.

We complete price the remedials line by line so you can and register the work where notification applies.

Carry out the work, retest the affected circuits. You get the figures, not just a verdict.

This page is written for Bridgend specifically — Bridgend County Borough Council area, CF31–CF35.

Why people in Bridgend ask for it

  • An agent or tenant chasing remedials before a tenancy starts. It affects sequence more than cost.
  • A purchase held up by an adverse electrical report. Worth knowing before booking.
  • In our experience locally, remedials from a previous cycle never completed and now repeated.

What the remedial works certificate and reissued report actually covers

An unsatisfactory report is not a disaster; it is a list. Every observation carries a code, and the codes tell you what has to be corrected before the installation can be declared satisfactory and what is merely recommended.

Before we arrive — where a report is unsatisfactory, remedial work should be carried out by a qualified person and evidenced with certification. In rented property, landlords are expected to act on C1, C2 and FI codes promptly.

What the result can say

FI items investigated and either cleared or recoded with evidence. It affects sequence more than cost.
C3 items quoted separately so you can choose rather than be charged by default. Worth knowing before booking.

The process, step by step

  1. 1Review the existing report and separate mandatory codes from recommendations. It affects sequence more than cost.
  2. 2Carry out the work, retest the affected circuits and certify. Worth knowing before booking.
  3. 3In our experience locally, reissue or supplement the report confirming the installation is satisfactory.
  4. 4Price the remedials line by line so you can see what each code costs to clear. No extra charge attaches to it.

No surprises on price — most domestic remedial schedules are a day or less. C1 items are treated as urgent and attended ahead of routine work.

Questions about the remedial works certificate and reissued report

Can you talk to my letting agent directly?

Yes, if you tell us who to contact. Access and reporting can both go through them.

What is the most common outcome?

A defined, limited piece of work. A report returned unsatisfactory by another contractor usually resolves without replacing the whole installation.

Will the power be off for long?

Only for the parts that require isolation. We plan the sequence so the Bridgend property is not dead all day.

How soon can this be booked?

Availability varies week to week. Bridgend is on our regular round, so it is usually a matter of days rather than weeks.

Do you cover Bridgend?

Yes — Bridgend, Porthcawl, Maesteg, Pencoed and the wider South Wales area.

Bridgend context

Bridgend's Brackla and Parc Derwen estates carry modern boards but often need SPD retrofits, while central Bridgend terraces still throw the classic RCD-nuisance-trip pattern.

Bridgend is at the centre of the area we cover daily.

Anywhere between Porthcawl and Bridgend is standard coverage, not an extra.

Bridgend consumer unit upgrades: new 18th Edition consumer unit fitted with RCBO protection, photographed on-site in CF31–CF35 (CF31–CF35) — Fixing an unsatisfactory EICR, Bridgend: taken while testing was in progress

Check availability for CF31–CF35 — Fixing an unsatisfactory EICR in Bridgend

Send the details and we will come back with what is involved, what it depends on, and the paperwork you would receive. We cover Bridgend and the CF31–CF35 postcodes, including Maesteg, for fixing an unsatisfactory eicr. Ask anything before booking — plenty of Bridgend calls end with advice and no visit.