Titan Electrical Solutions
post-2005 · New-Build House

Port Talbot eicr — electrical safety checks on a new-build

modern cavity construction, service voids designed in, plasterboard on dabs. Service voids and pre-planned cable routes make additions straightforward — but the developer board is often the bottleneck.

The awkward part of eicr — electrical safety checks on a Port Talbot new-build isn't the install — it's the route. Service voids and pre-planned cable routes make additions straightforward — but the developer board is often the bottleneck.

We map the route at survey, mark it up on a photo, and price against that specific plan. Nothing gets discovered mid-job that could have been priced at quote stage.

What we build into every quote

  • Access constraints priced into the diary — a new-build in Port Talbot isn't the same working day as a new-build with an empty garage.
  • Wiring generation on record (current — often 17th or 18th Edition compliant at handover but with no headroom) so the quote reflects what's actually in the house, not what the brochure assumes.
  • Fixed price at quote stage, calibrated to post-2005 construction — not a generic South Wales rate.
  • Certificate at the end, delivered the same evening, in the format your next EICR or agent will expect.

Construction & access

Service voids and pre-planned cable routes make additions straightforward — but the developer board is often the bottleneck.

Wiring generation & likely findings

Wiring generation on this stock is typically current — often 17th or 18th Edition compliant at handover but with no headroom. On a new-build you should expect us to flag: developer CU maxed out — no spare ways for an EV charger or garden feed; no SPD retrofit, which the 2022 amendment now expects; EV cable stub left by the developer that terminates at an isolator, not a working charger.

Materials we spec

Materials and methods we spec on new-build house work: spare-way CU add; SPD retrofit inside the existing enclosure; OCPP-compliant charger onto the developer stub. Everything is priced on the quote — nothing added on invoice.

What to expect

  1. 01

    Photo or on-site survey

    Focus on the utility room or garage, the consumer unit location, and the intended cable route. Usually 15–30 minutes on-site or a short photo set.

  2. 02

    Written fixed quote

    Priced against your new-build's specific construction, not a template. Route sketched, materials listed, no line-item surprises.

  3. 03

    Booked around access

    Diary planned for the access constraint that matters on this stock — service voids and pre-planned cable routes make additions straightforward — but the developer board is often the bottleneck.

  4. 04

    Certificate + evidence pack

    NICEIC certificate, photo evidence of hidden work, Part P where applicable — all emailed the evening the job signs off.

Port Talbot context

In the Port Talbot area, new-build addresses cluster in specific streets — we know the layouts before we walk in, which shortens the survey and firms up the quote.

FAQs — new-build house in Port Talbot

Do you need to see the property before quoting?+

For a new-build usually yes — a 15-minute survey or a set of photos of the utility room or garage and the consumer unit is enough to write a fixed price.

What materials do you spec on this property type?+

spare-way CU add; SPD retrofit inside the existing enclosure; OCPP-compliant charger onto the developer stub. All on the written quote.

What's specific about eicr — electrical safety checks on a new-build?+

Two things: developer CU maxed out — no spare ways for an EV charger or garden feed, and the wiring generation — current — often 17th or 18th Edition compliant at handover but with no headroom. Both go on the quote, not the invoice.

Will the work affect any original features?+

Not unless the quote says so. On period stock in particular we route through floors, lofts and non-original plaster; cornices, dado rails and original panelling stay intact.

Nearby coverage

New-Build House stock isn't confined to Port Talbot — the same construction era shows up across Neath and Bridgend. We consolidate diary days across the postcode.

Summary

Bottom line: new-build house owners in Port Talbot deserve a quote calibrated to post-2005 construction, not a template. That's what we do, on every job.

EICR — Electrical Safety Checks on new-build house stock — Port Talbot

EICR — Electrical Safety Checks project in Port Talbot: modern fuse board installed in a domestic hallway, delivered on a steelworks-era terraces in Aberavon and Sandfields address the Port Talbot areaelectrical safety report being filled in on-site completed during a eicr — electrical safety checks job in Port Talbot — Port Talbot (SA12–SA13)Titan Electrical Solutions — eicr — electrical safety checks in Port Talbot. new 18th Edition consumer unit fitted with RCBO protection on a steelworks-era terraces in Aberavon and Sandfields home Port Talbot

Talk to an electrician who works on new-build stock every week

Send the address, a photo of the utility room or garage and the consumer unit, and the add what the developer skipped you're working towards. Written fixed quote back inside 24 hours, priced to the actual construction of your new-build.

EICR — Electrical Safety Checks on new-build houses in nearby towns