Whether this is urgent or simply overdue, the sequence for consumer unit upgrades on a new-build does not change much. On a new-build you should expect us to flag: developer CU maxed out — no spare ways for an EV charger or garden feed; no SPD retrofit, which the 2022 amendment now expects; EV cable stub left by the developer that terminates at an isolator, not a working charger. Mountain Ash sits inside the area we work daily, so a follow-up visit is not a logistical problem if one is needed. Which is why the price follows the test rather than the other way round.
What we are really assessing is condition, not age. Diary planned for the access constraint matters; the date on the board does not, by itself. The regulations are specific about it, so there is little room for opinion. If the property has been altered, extended or let out, consumer unit upgrades on a new-build deserves more than a quick look.