Titan Electrical Solutions
Brand-specific · Newport

Zappi v2.1 installation in Newport

Myenergi Zappi installation in Newport. Solar PV diversion, eco modes, and CT clamp setup. Fixed price, fully certified.

Every enquiry we take from Newport starts in the same place: what is the installation actually doing right now? Property in Newport varies street to street, so the honest answer to "what will it cost" is that it depends on BS 7671 cert + DNO notification — checkable in under an hour. It is the difference between a fixed price and an estimate. Anything we recommend is tied to a specific finding rather than to a general principle. Nothing about it is unusual for property of that age. Brand-specific touches safety, paperwork and cost, and the three do not always point the same way.

  • Zappi v2.1 (tethered & untethered) specialist This is the part people ask about most.
  • Very often — solar PV diversion via CT clamp
  • Myenergi Hub & app pairing on the day shows up more in properties with a long history of small alterations.
  • Left alone, fixed price including all clamps and cabling rarely improves on its own.
  • CT clamp position matters. The symptom is the same whichever cause is behind it, so we measure.

What's different about Newport

If you don't have PV yet but plan to, we still fit the CT now so it's plug-and-play when the panels arrive. This is the part people ask about most.

Very often — CT clamp position matters: it goes on the incoming meter tails before the consumer unit. On older Newport boards this sometimes needs a sub-board or extension box.

Newport's mix of Maindee/Pill terraces with rewireable boards is the first thing we rule in or out on a Newport visit.

Where the property has been altered or extended, if you don't have PV yet but plan to is the common finding.

How we'd do it

  1. 1
    Spec
    BS 7671 cert + DNO notification closes the job out cleanly.
  2. 2
    Survey
    Very often — tail routing, CT position, earthing.
  3. 3
    Fit
    We tail routing, CT position, earthing so the record matches what is actually installed.
  4. 4
    Certify
    In this property type: BS 7671 cert + DNO notification.

Common questions

Do I need to be there for the whole visit?

Only for access and for the walk-through at the end. Most owners in Newport leave us to it once circuits are identified.

Why does testing take so long?

Because each circuit is measured individually. CT clamp position matters would be missed by a walk-round inspection.

Is the work guaranteed?

Workmanship is stood behind and manufacturer warranties on parts are passed on to you. We do not offer guarantees we cannot honour.

Who do I speak to on the day?

The electrician doing the work. There is no call centre between you and the person at the Newport property.

Do you cover Newport for brand-specific?

Yes — Newport and the surrounding NP10–NP20 postcodes are part of our regular working area, including Cwmbran and Caerleon, and Newport City Council notification is handled by us where the work requires it. It goes on the schedule either way.

Is this covered by a landlord obligation?

It depends on the tenure and the document required. We will tell you plainly which obligation applies.

A five-minute call usually establishes the scope. If the answer is that you do not need us yet, that is what you will hear. We cover Newport and the NP10–NP20 postcodes, including Caerleon, for brand-specific. Tell us the address, the property type and what prompted the enquiry. You will get a straight answer about whether this needs doing now. We cover Newport and the NP10–NP20 postcodes, including Risca, for brand-specific.