Titan Electrical Solutions
Fuse box / CU · Bridgend

Fuse box replacement in Bridgend

Replace your old Bridgend fuse box with a modern 18th Edition consumer unit. Fixed price, single-day fit, Part P notified.

If the property has been altered, extended or let out, fuse box / cu deserves more than a quick look. Owners often ask whether this can wait. Sometimes it can, and where where the meter tails are too short to reach is the only finding we will say so plainly. We would explain the same thing on site, just with the board open. Whether the property is owner-occupied or let in Bridgend, the technical work is identical — only the paperwork's recipient changes. That is the honest version, rather than the version that sells more work. Fuse box / cu is easy to get quoted badly and hard to get quoted honestly without looking at the installation first.

  • Common around CF31–CF35 — part P notified to Building Control
  • Around CF31–CF35: power off typically 4–6 hours
  • Power off typically 4–6 hours — cheap to confirm with instruments, expensive to assume.
  • On older Bridgend terraces, the existing meter tails are. Left alone it tends to widen rather than settle.
  • Bridgend's Brackla and Parc Derwen estates carry modern boards — one of several possibilities, all of which get checked.

What's different about Bridgend

Common around CF31–CF35 — bridgend's Brackla and Parc Derwen estates carry modern boards but often need SPD retrofits, while central Bridgend terraces still throw the classic RCD-nuisance-trip pattern, so the new board often needs an earth rod or a TT earthing arrangement if the supply isn't PME.

Around CF31–CF35: where the meter tails are too short to reach a new board position, we coordinate with the DNO for a meter relocation — we book this for you, no extra cost.

Where the meter tails are too short to reach. We check it early because it is quick to eliminate.

Confirming old rewireable / BS 3036 boards swapped takes minutes; assuming it wastes a visit.

How we'd do it

  1. 1
    Survey
    We check board, tails, earthing and supply size before deciding what, if anything, needs replacing.
  2. 2
    Install
    Around CF31–CF35: single-day swap with a 4–6 hour power-off window.
  3. 3
    Certify
    Single-day swap with a 4–6 hour power-off window, with the old parts left for you to see.
  4. 4
    Quote
    Where the property allows: fixed price including any earthing or tail upgrades.

Common questions

Can you advise without doing the work?

Yes. Plenty of Bridgend visits end with advice and no invoice for work that is not needed yet.

How far in advance should I book?

For non-urgent work, a week or so gives the most choice of slots across CF31–CF35.

Do you charge to come out and look?

Attendance and testing are quoted before we travel to Bridgend, so there is nothing added afterwards that was not agreed.

Do you work on commercial premises too?

Yes, across CF31–CF35 and the wider area. The testing regime differs but the approach is the same.

Do you cover Bridgend for fuse box / cu?

Put simply: yes — Bridgend and the surrounding CF31–CF35 postcodes are part of our regular working area, including Porthcawl and Maesteg, and Bridgend County Borough Council notification is handled by us where the work requires it.

How do I know the price will not change?

Because it is set after testing, not before. Extra work is only ever agreed with you first.

Booking is by phone or form; either way you speak to the person who would carry out the work. We cover Bridgend and the CF31–CF35 postcodes, including Maesteg, for fuse box / cu. Describe what the property is doing and when it started. We will tell you whether it is urgent or plannable. We cover Bridgend and the CF31–CF35 postcodes, including Pencoed, for fuse box / cu.