Titan Electrical Solutions
Grants & funding · Aberdare

Using the OZEV grant for an EV charger in Aberdare

Who qualifies for the OZEV EV charger grant in Aberdare, how much it knocks off, and how we handle the paperwork end-to-end.

This is a practical page about grants & funding in Aberdare — no stock photography claims, no invented statistics. Properties around Aberdare that have changed use — a room converted, an extension added — usually need a wider look than the original request implies. Anyone testing properly will reach the same conclusion. A property in Aberdare that has never been inspected is not necessarily unsafe — it is simply unknown, and that is the part worth fixing. It rarely changes the price, but it does change the plan. The Aberdare version of this job is shaped by the local housing: ex-mining cottages in Trecynon and Cwmbach.

  • In most Aberdare cases: we submit the paperwork — no chasing
  • The relevant point here: grant deducted at invoice, not as rebate
  • Pairs with smart tariffs (Octopus Intelligent Go etc.), and the certificate records it either way.
  • Landlords across Aberdare can claim up to two grants is one of the few things we would ask you to stop using until tested.
  • Damp ingress and age combine, and flat owners need landlord/freeholder permission in writing; the grant is the outcome.

What's different about Aberdare

In most Aberdare cases: flat owners need landlord/freeholder permission in writing; the grant won't pay without it. We supply a template that satisfies Rhondda Cynon Taf County Borough Council planning conditions where relevant.

The relevant point here: older Aberdare cottages frequently lack RCD protection on any circuit, meaning a consumer unit upgrade is almost always the first remedial after an EICR, which can affect the grant application if remedials are needed before install.

Older Aberdare cottages frequently lack RCD protection on any. In practice that is confirmed with a meter, not a torch.

Look for up to £350 off the install for eligible homes before assuming the board is at fault.

How we'd do it

  1. 1
    Eligibility check
    We confirm in 2 minutes whether you qualify — the step people most often find has been skipped previously.
  2. 2
    Quote
    The relevant point here: fixed price written with grant already deducted.
  3. 3
    Install
    Single-day fit, paperwork submitted same week, so nothing is left to be discovered on a second visit.
  4. 4
    Grant settled
    OZEV reimburses us directly — invoice already discounted. We flag it rather than assume you know.

Common questions

Will you work on a tenanted property?

Yes. We arrange access with the tenant directly if you prefer, and the report goes to you as the Aberdare landlord.

Will the power be off for long?

Only for the parts that require isolation. We plan the sequence so the Aberdare property is not dead all day.

Will you need to lift floors?

Only if the findings require it, and only with your agreement. We use existing access wherever it exists.

Can you supply the report electronically?

Yes, as a PDF the same or next working day, with the Aberdare address and circuit schedule on it.

Do you cover Aberdare for grants & funding?

As a rule, yes — Aberdare and the surrounding CF44 postcodes are part of our regular working area, including Merthyr Tydfil and Mountain Ash, and Rhondda Cynon Taf County Borough Council notification is handled by us where the work requires it.

Do you handle larger planned projects?

Yes, phased across a programme so the Aberdare site stays usable while work proceeds.

Give us the CF44 postcode and access details and we will confirm what the visit would cover. We cover Aberdare and the CF44 postcodes, including Pontypridd, for grants & funding. Send a short description and any previous certificate. We will say what testing is needed before we quote anything. We cover Aberdare and the CF44 postcodes, including Merthyr Tydfil, for grants & funding.