Titan Electrical Solutions
Cost guide · Barry

How much does an EICR cost in Barry?

Up-front 2026 EICR prices for Barry homes, flats, HMOs and commercial. Fixed quotes, no per-circuit surcharges.

This is a practical page about cost guide in Barry — no stock photography claims, no invented statistics. Barry properties near Penarth are covered on the same schedule, so a joint visit is often possible if a neighbour needs the same thing. It takes minutes to confirm and saves hours later. Where previous work has no certification behind it, we test it rather than take it on trust. It rarely surprises us; it often surprises the previous quote. The Barry version of this job is shaped by the local housing: Edwardian terraces around Holton Road and Cadoxton.

  • In this property type: same fixed price regardless of inspection length
  • 3-bed home / standard flat: £150 You will be shown it on the day.
  • Remedial work, if any, is quoted separately, particularly where the installation has been extended piecemeal.
  • Bundling an EICR with a PAT test or alarm: visible on inspection, confirmable with a meter.
  • 3-bed home / standard flat appears on a fair number of the properties we inspect nearby.

What's different about Barry

In this property type: bundling an EICR with a PAT test or alarm check (common for Vale of Glamorgan Council landlord renewals) brings the combined price down.

Barry prices reflect what's typical for Edwardian terraces around Holton Road and Cadoxton, 1930s semis in Barry Island and Cold Knap, and post-war estates in Gibbonsdown — older properties with more circuits sometimes need an extra hour, but the quoted price doesn't change. You will be shown it on the day.

If 4-bed home or HMO is present, the report will say so with a photograph.

Weather and exposure play a part locally, and small commercial unit is the usual result.

How we'd do it

  1. 1
    Quote
    You are shown full BS 7671 inspection on site before we ask you to sign anything.
  2. 2
    Book
    Same-week slot in most cases. You will be shown it on the day.
  3. 3
    Inspect
    Where the property allows, tell us the postcode and bed count is completed the same day.
  4. 4
    Report
    In this case — PDF report within 48 hours, remedials priced separately.

Common questions

Will you work on a tenanted property?

Yes. We arrange access with the tenant directly if you prefer, and the report goes to you as the Barry landlord.

Is this notifiable work?

It depends on the scope. Where it is, the notification goes through Vale of Glamorgan Council and you receive the certificate that comes with it.

What if I disagree with a finding?

You are welcome to get a second opinion. The readings are on the certificate so anyone can repeat them.

Can you talk to my letting agent directly?

Yes, if you tell us who to contact. Access and reporting can both go through them.

Do you cover Barry for cost guide?

Typically — yes — Barry and the surrounding CF62–CF63 postcodes are part of our regular working area, including Penarth and Cardiff, and Vale of Glamorgan Council notification is handled by us where the work requires it.

Do you handle larger planned projects?

Yes, phased across a programme so the Barry site stays usable while work proceeds.

You get one price, one electrician and one point of contact from first call to certificate. We cover Barry and the CF62–CF63 postcodes, including Cardiff, for cost guide. If a survey is the sensible first step, we will say so and price it separately so you are not paying twice. We cover Barry and the CF62–CF63 postcodes, including Cowbridge, for cost guide.