Titan Electrical Solutions
Offices and shared workspaces

Electrical contractor for Cardiff offices and shared workspaces

Offices and shared workspaces for Cardiff property: tested first, explained plainly, then priced in writing. Available throughout Cardiff, including Caerphilly.

You can spend a lot on offices and shared workspaces or very little. Which one is right depends on measurements, not on the quote.

Office electrical work is mostly about density and flexibility. Timescales are given honestly. If a part has to come, we say when rather than leaving it open. For Victorian and Edwardian terraces across Cathays and Roath that detail matters more than it does elsewhere.

We would rather turn a Cardiff job down than take on something we cannot certificate honestly. We would explain the same thing on site, just with the board open.

Nothing is charged for on the basis of a guess. Where a reading is borderline, it is reported as borderline. That is the honest version, rather than the version that sells more work.

We treat Cardiff as its own round rather than an outlying job, which is why work in Penarth tends to be scheduled alongside it. Around CF10–CF24 it is no current EICR that decides how long the visit takes.

You deal with the same electrician from first call to final certificate. The regulations change; the approach of measuring before advising does not.

Desk power fed by daisy-chained extension leads, which is why the whole circuit gets tested and not just the visible part.

Lighting still on legacy fluorescent fittings with failing control, especially on circuits that were extended rather than replaced.

No current EICR is straightforward to correct once it has been identified properly.

Server or comms cupboards with no dedicated supply, no — often visible once the accessory is taken off the wall.

Floor boxes, dado trunking and desk power reconfiguration. That covers the part most people are unsure about.

LED lighting upgrades with presence detection and daylight dimming. Nothing gets replaced on a hunch.

Fixed wire testing, board labelling and remedial works, and the outcome decides the next step rather than a sales script.

Dedicated comms and server supplies with clear local isolation. It is the part that protects you if it is ever questioned.

Emergency lighting design, install and testing regime, recorded so it can be checked later.

Written with Cardiff housing and Cardiff Council requirements in mind.

new 18th Edition consumer unit fitted with RCBO protection completed during a eicr — electrical safety checks job in CF10–CF24 — Cardiff (CF10–CF24) — Offices and shared workspaces, Cardiff: board cover removed for inspection
offices, studios, co-working floors and professional practices

The Cardiff picture

Cardiff Council is the notification authority for Cardiff, and notifiable work is registered as part of the job rather than left to you.

What tends to go wrong on these sites

One of the usual points: no current EICR, which stalls lease renewals and insurance renewals.
Server or comms cupboards with no dedicated supply, no local isolation and no ventilation consideration. This is the part people ask about most.
Very often — desk power fed by daisy-chained extension leads because the original floor boxes no longer match the layout.

Scope of works

  • One of the usual points: fixed wire testing, board labelling and remedial works to close observations
  • Dedicated comms and server supplies with clear local isolation This is the part people ask about most.
  • Very often — emergency lighting design, install and testing regime

Please note: the Electricity at Work Regulations 1989 place the duty on the employer or occupier to maintain the installation safely. Periodic inspection plus an emergency lighting log is the standard way to evidence it.

A large share of the property we see in Cardiff is Victorian and Edwardian terraces across Cathays and Roath.

Neighbouring Penarth, Caerphilly, Pontypridd are covered from the same base as Cardiff.

The commercial detail: office work is normally phased floor by floor or bay by bay so no team loses power for a full day, with any full isolation taken at a weekend.

Commercial questions we get asked

Can you rework desk power without closing the office?

Usually yes. We phase by bay, isolate one area at a time, and keep the rest of the floor live and working.

Can you talk to my letting agent directly?

Yes, if you tell us who to contact. Access and reporting can both go through them.

How soon can this be booked?

Availability varies week to week. Cardiff is on our regular round, so it is usually a matter of days rather than weeks.

What if I have had this looked at before?

Bring us the previous report if you have one. We test independently but it is useful to see what changed.

Who notifies building control?

We do, through Cardiff Council where the work is notifiable. It is included rather than charged as an extra.

Offices and shared workspaces for Cardiff property: tested first, explained plainly, then priced in writing. Available throughout Cardiff, including Caerphilly.

Ask a question before booking

Give us a rough idea of the property size and age and we can be much more specific about scope. Cardiff Council notification is handled by us where the work requires it.

🔒 No spam. Fast response, 8am – 9pm 7 days a week.