Titan Electrical Solutions

Fixing an unsatisfactory EICR — Neath and surrounding SA10–SA11

Fixing an unsatisfactory eicr across Neath: honest scope, recorded results, certification on completion. Available throughout Neath, including Port Talbot.

  • One of the usual points: an agent or tenant chasing remedials before a tenancy starts.
  • A purchase held up by an adverse electrical report. This is the part people ask about most.
  • Very often — remedials from a previous cycle never completed and now repeated.
Call 07949 398752

There is a short version and a long version of fixing an unsatisfactory eicr. The short version: test it, then decide.

Questions asked during the visit get answered during the visit; there is no benefit to either of us in keeping it mysterious. The regulations are specific about it, so there is little room for opinion.

Neath properties near Swansea are covered on the same schedule, so a joint visit is often possible if a neighbour needs the same thing. Which is why the schedule of results is worth reading, not filing.

Owners in Neath often ask whether this is a repair or the start of something bigger. Testing answers that; opinion does not. For semi-rural cottages around Cimla that detail matters more than it does elsewhere.

We would rather turn a Neath job down than take on something we cannot certificate honestly. We would explain the same thing on site, just with the board open.

Most enquiries reaching us from Neath arrive after something has already been tried. Starting from measurements rather than the previous attempt saves time. That is the honest version, rather than the version that sells more work.

If a part needs ordering, you will know the timescale before we leave. Every reading we take is on the report, so a second opinion can check our work.

Remedials from a previous cycle never completed and now. It rarely announces itself until load is applied.

A report returned unsatisfactory by another contractor. In practice that is confirmed with a meter, not a torch.

Where fittings have been changed over the years, an agent or tenant chasing remedials before a tenancy is the usual culprit.

Weather and exposure play a part locally, and a purchase held up by an adverse electrical report is the usual result.

Reissue or supplement the report confirming the installation is, which is the difference between a repair and a patch.

Review the existing report and separate mandatory codes — no shortcuts, because the paperwork has to stand up.

Price the remedials line by line so you can — the same process whether the property is in Neath or Swansea.

Carry out the work, retest the affected circuits. Nothing gets replaced on a hunch.

Written with Neath housing and Neath Port Talbot Council requirements in mind.

What happens on the day

  1. 1One of the usual points: review the existing report and separate mandatory codes from recommendations.
  2. 2Reissue or supplement the report confirming the installation is satisfactory. This is the part people ask about most.
  3. 3Very often — price the remedials line by line so you can see what each code costs to clear.
  4. 4Carry out the work, retest the affected circuits and certify. We flag it rather than assume you know.

As with every job in SA10–SA11: most domestic remedial schedules are a day or less. C1 items are treated as urgent and attended ahead of routine work.

What the remedial works certificate and reissued report actually covers

An unsatisfactory report is not a disaster; it is a list. Every observation carries a code, and the codes tell you what has to be corrected before the installation can be declared satisfactory and what is merely recommended.

While you wait: where a report is unsatisfactory, remedial work should be carried out by a qualified person and evidenced with certification. In rented property, landlords are expected to act on C1, C2 and FI codes promptly.

Why people in Neath ask for it

  • One of the usual points: an agent or tenant chasing remedials before a tenancy starts.
  • A purchase held up by an adverse electrical report. This is the part people ask about most.
  • Very often — remedials from a previous cycle never completed and now repeated.

Questions about the remedial works certificate and reissued report

Can you supply the report electronically?

Yes, as a PDF the same or next working day, with the Neath address and circuit schedule on it.

Can I use my own materials?

If they are suitable and certified, yes. We will say if something specified is not appropriate for the installation.

Will the power be off for long?

Only for the parts that require isolation. We plan the sequence so the Neath property is not dead all day.

What should I have ready before you arrive?

Access to the board and to the affected area, plus any previous certificates. That is enough to start at the Neath property.

How quickly can you attend in Neath?

Most domestic remedial schedules are a day or less. C1 items are treated as urgent and attended ahead of routine work. Neath sits close to M4 J43, which is why we can usually add a SA10–SA11 job to the same day.

What the result can say

One of the usual points: C1 and C2 items cleared and the installation declared satisfactory.
FI items investigated and either cleared or recoded with evidence. This is the part people ask about most.

Neath context

Neath Port Talbot Council handles building control notification for Neath, and we register notifiable work there as part of the job.

A large share of the property we see in Neath is semi-rural cottages around Cimla.

Neath and the villages around it — Port Talbot and Bridgend — sit on one route for us.

EICR testing in progress with a multi-function tester on a live circuit — consumer unit upgrades by Titan Electrical Solutions at a coastal homes near the Neath river mouth property in Neath Abbey Business Park and Baglan Energy Park (SA10–SA11) — Fixing an unsatisfactory EICR, Neath: taken with the customer present

Start with a survey

Send a short description and any previous certificate. We will say what testing is needed before we quote anything. Neath Port Talbot Council notification is handled by us where the work requires it.

🔒 No spam. Fast response, 8am – 9pm 7 days a week.