The starting question with ev charger installation is always the same: what does the existing installation test at? If something falls outside what we can do properly, we say so and point you at who does it, rather than attempting it. The paperwork explains it in the same words we would use on site.
Properties around Bridgend that have changed use — a room converted, an extension added — usually need a wider look than the original request implies. Around CF31–CF35 it is BS 7671 certificate issued, app that decides how long the visit takes. We take a steady number of ev charger installation enquiries from Bridgend each month, and the pattern is fairly consistent.


